Key Project Statistics
- 30,000m3 earthworks
- 4,300m of stormwater drainage (sizes from 100 – 600 dia)
- 1,600m directionally drilled drainage 150 dia PE
- 1,100m retaining walls 1m to 4m high – retaining walls are a mix of timber soldier with lagging, bored steel soldiers with timber lagging.
- 1,300m gabion barriers – these act as both a pavement retaining structure and longitudinal drainage structure.
- 2,700m utility trenches
- 4km pavement and roading – controlled fill/ MSE walls to subgrade, metal base construction and insitu concrete pavement/ surface
- 1,100m 11kv ducting directionally drilled
30000m3
Earthworks
4300m
SW pipe
1100m
Retaining walls
1300m
Gabion barriers
By fostering collaboration between the client and design team, CB Civil commenced physical work before finalising the building consent design. This proactive approach expedited the project by an entire earthworks season compared to traditional build-only methods. CB Civil self-performed all on-site operations, mobilizing approximately 40 staff members for the project.