620m2

Permeable Paving

250m2

Footpath

2800m3

Cut to Waste

This project was a 32 lot Subdivision with 2 and 3 story Building/apartments

CB Civil provided:

Sole Subcontractor to HNZ for Civil Works including:

  • Bulk Earthworks
  • 2700m³ of Fill
  • 110m of Under Channel Drains, 300m of Stormwater Drainage, Underground Detention Tank and 300m of Waste Water Drainage.
  • 450m of individual services installed (Chorus and Vector)
  • 1000m of Watermain
  • 200m² of timber retaining walls ranging from 0.3 to 1m in height.
  • 1000m² of Subbase and Base Coarse layers built
  • 350m of Kerb and Channel installed across Accessways, footpaths and Carparks
  • 750m² of Reinforced Accessway

 

Contracted Works completed in time, with an extension of time-based on variation works completed during the contract period