This project was required to be constructed in a very constrained site, in a very tight timeframe. CB delivered the project ahead of schedule and within budget.

This project involved the construction of a 13m deep x 5.2 diameter shafts, with penetration connections of new and existing SW tunnels. The shafts are constructed using DOKA form work panels, with steel cases and segments lifted in place using a 100 Tonne crane.

IMG 1280

CB Civil was responsible for:

  • Management of Temporary works design
  • De-watering of the 13m deep excavations 
  • Connection, waterproofing and casting of tunnel structure around the base of the shaft
  • Completion of lift plans for complex lifts of formwork and steel cages
  • Installation of scaffold and temporary works access and platforms for construction
  • In-situ tying of steel and erection of DOKA formwork panels 
  • In-situ timber formwork for channels, floors and geometric elements f construction
  • Pre-Cast of elements for shaft permanent access
  • Pumping and finishing of structural concrete
  • Flowable fill backfill
  • HSEQ compliance

CB Civil has reported strongly on the project showing a good health and safety culture on site. CB Civil recorded over 95% on the client and internal audits.